INSTALLATION REQUIREMENTS

Operation of EKG dewatering bags requires the following ancillary equipment:

  • A simple framework or a drainage platform
  • Slurry delivery method e.g. pumping
  • DC supply 0 to 60V up to 2kW per bag depending upon slurry characteristics
  • Electrical cables for connection
  • Anode ring and one set of sacrificial rods.

Connection of anode and bag.

 